Hornby TT:120 GNER, Mk3 HST Trailer Standard Disabled Coach TFD No.42363 - TT4063

£41.99

The GNER HST Mk3 Trailer Standard Disabled 42363 captures the distinctive look and functionality of this essential coach which played a crucial role in making high-speed rail travel more inclusive.  Finished...

Hurry, there are only 2 item(s) left!
Description

The GNER HST Mk3 Trailer Standard Disabled 42363 captures the distinctive look and functionality of this essential coach which played a crucial role in making high-speed rail travel more inclusive. 

Finished in the striking deep blue and red GNER livery, this model features precision detailing, accurately applied branding, and a carefully recreated interior layout. 

The GNER HST Mk3 TSD 42363 pairs seamlessly with other TT:120 Mk3 coaches and power cars, bringing authenticity and prestige to any modern-era railway.

History

BR developed the Mark 3 in response to improved comfort provided by airline companies and the convenience provided by the family car, both of which were taking traffic away from the railways in the early 1970s. 

Originally conceived as locomotive-hauled stock, the first to be produced were for the prototype HST in 1972. 

The first production vehicles entered service in 1975 and continued to be built until 1988. Although outwardly similar to the Mark 2 carriage, it is of a completely different design, having a ridged roof and under-frame skirt, whereas its predecessor had a smooth roof and visible below-frame equipment. The body is 75ft-long (23m), which is 10ft (3m) longer than the Mk2. 

It is also of full monocoque construction (one piece body shell) with an all-welded mild steel, stressed skin. To give it a superior smooth ride, it also has secondary air suspension and disk-brakes fitted to the wheels (rather than clasp brakes) which allow for running at speeds of up to 125mph (200km/h) and efficient deceleration. 

The Mk3 HST coaches differ from the Mk3A loco-hauled coaches mainly in terms of the electrical arrangements, but are otherwise much the same. 

These HST coaches take their supply from a three-phase electrical supply directly from an auxiliary alternator in the power car, whereas the Mk3A convert the single-phase AC supply from the locomotive through motor generator units under the floor, which change the train supply to three-phase.

Shipping & Delivery

We shall not be liable for any direct, indirect or consequential loss, costs, damages, charges or expenses caused directly or indirectly by any delay in the delivery of goods whatsoever. Delivery will be placed with royal mail, DHL, DPD etc. Delivery is usually between Monday-Friday 8am - 6pm. Dates and times quoted for delivery are approximate.

When you have an order with more than one item, all items will be shipped together. If you have ordered an item that is unavailable you will be refunded the amount. There is only one delivery charge per order.

Delivery is only available to UK mainland addresses. For deliveries to Northern Ireland, Scottish Islands, Isle of Man, Isle of Scilly, Jersey & Guernsey Europe etc will be at cost to you.

Goods will be deemed to have been delivered once signed for or a photo has been provided to the specified address.

If you want your parcel insured you NEED to pay the extra fees. If you do not insure extra any loss, damage or theft is no responsibility to us and you MUST take it up with the courier.