BackBack

Hornby R40033 FGW, Mk3 Trailer Standard Disabled (TSD), Coach C, 42012 - Era 10

£44.99

In-order to allow running at 125 mph on Britain's Victorian era railways, new rolling stock was needed by British Railways. Significant improvements over the Mk2 included new secondary air suspension between...

Hurry, there are only 1 item(s) left!
Description

In-order to allow running at 125 mph on Britain's Victorian era railways, new rolling stock was needed by British Railways. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk breaks and wheel slip protection enabling faster deceleration. The first Mk3 coaches to be delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972.

 

Mk3 coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset. After the HST Mk3 coach variant was introduced, further Mk3 coaches were introduced to the West Coast Mainline for use as part of locomotive hauled trains. Whilst Mk3 stock is standard for HST units, the standard locomotive hauled stock is Mk3a. Mk3a stock differs from Mk3 stock due to the inclusion of buffers as well as a different electrical system that uses motor generator units in each coach to power air conditioning and other ancillaries Mk3a stock was built until 1984, before 3B stock with improved seating and lighting was built from 1985 to 1988.

 

In 1996, as a result of the privatisation of British Rail, The InterCity Great Western franchise was awarded to Great Western Trains who in 1998 became First Great Western (FGW). FGW operated Mk3 coaches in HST car-sets from London Paddington to various locations in the west, south wales and south-west. FGW was rebranded as Great Western Railways in September 2015 and in 2017 started to replace its InterCity 125 sets with new Hitachi Class 800 and 802 sets.

Shipping & Delivery

We shall not be liable for any direct, indirect or consequential loss, costs, damages, charges or expenses caused directly or indirectly by any delay in the delivery of goods whatsoever. Delivery will be placed with royal mail, DHL, DPD etc. Delivery is usually between Monday-Friday 8am - 6pm. Dates and times quoted for delivery are approximate.

When you have an order with more than one item, all items will be shipped together. If you have ordered an item that is unavailable you will be refunded the amount. There is only one delivery charge per order.

Delivery is only available to UK mainland addresses. For deliveries to Northern Ireland, Scottish Islands, Isle of Man, Isle of Scilly, Jersey & Guernsey Europe etc will be at cost to you.

Goods will be deemed to have been delivered once signed for or a photo has been provided to the specified address.

If you want your parcel insured you NEED to pay the extra fees. If you do not insure extra any loss, damage or theft is no responsibility to us and you MUST take it up with the courier.